  • Client: ExxonMobil Cepu Ltd.
  • Project Date: February 2017 - Maret 2017
  • Categories: ROV, Inspection, Survey, Air Diving
  • Location : Offshore East Tuban, INA
  • Vessel: Resolution
  • Duration: 3 Years
  • Water Depth: 10 - 33 MSW
  • WROV: SMD Quasar Compact 05 SAAB Seaeye Tiger #891
  • Air Diving ADS - 01

ROV & Air Diving Inspection of Pipeline, Mooring Tower & FSO UWILD

In July 2016, ExxonMobil Cepu Limited awarded Seascape a Three (3) Year Contract for the Provision of In-Water Services for Subsea Pipeline, FSO, Mooring Tower and Pipeline Rise.

The primary scope of work included ROV based inspection of the 20” Export Pipeline from the point of burial at the shore approach to the Mooring Tower, ROV based inspection of the Mooring Tower and Pipeline Riser and combined Air Diving and ROV Underwater Inspection In Lieu of Dry Docking (UWILD) of FSO Gagak Rimang.

In addition to the contract may be utilized for the future planned or unplanned subsea services.